XL-21 Power Distribution Cabinet Overview

Category:

Description

XL-21 Low-Voltage Power Distribution Cabinet | Industrial Grade | Clifnor

Product Overview: The XL-21 low-voltage power distribution cabinet is a high-performance solution designed for power plants, industrial facilities, and mining enterprises. It is specifically engineered for efficient power distribution within three-phase four-wire or three-phase five-wire systems with an AC voltage rating up to 500V.

Key Features:

  • Design: Designed as an indoor device with a robust shell made of precision-bent steel plates for maximum durability.

  • Operational Control: The front door features integrated test instruments and a dedicated switch handle for easy monitoring and manual operation.

  • Customization: Flexible internal configuration allows for various types and current ratings of circuit breakers to meet specific customer requirements.

Technical parameters of the main equipment:

Disconnector-Fuse

TYPE Rated current (A) Fuse-rated current(A) Remark
HR3-400/34 400 150, 200, 250, 300, 350, 400 No fuse when install knife switch

Air Circuit Breaker (ACB)

TYPE Rated current (A) Tripping Current Setting‌(A) Remark
DZ15-40/390 20 7、10、15、20、30、40
DZ10-100/300 100 15、20、25、30、40、50、60、80、100
DZ10-250/330 250 100、120、140、170、200、225、250

Current Transformer

TYPE Primary current(A) Secondary current(A) Remark
LM-0.5 75、100、150、200、300、600 5

Fuse

TYPE Fuse Fuse-rated current(A) Remark
RL1-15 15 2、4、5、6、10、15
RL1-60 60 20、25、30、35、40、50、60
RL1-100 100 30、40、50、60、80、100
RL1-200 200 80、100、120、150、200
RL1-400 400 150、200、250、300、350、400

AC Contactor

TYPE Rated current (A) Attracting coil voltage(V) Remark
CJ10-10 10 AC
110
220
380
CJ10-20 20
CJ10-40 40
CJ10-80 80
CJ10-150 150

Instrument

TYPE Name Unit Range Remark
44L1-A Ammeter A 5、10、15
5、10、15、20、30、50、75、100、150、200
44L1-V Voltmeter V

 

Operation, Maintenance, and Repair Protocol

To ensure the longevity and operational safety of the XL-21 Power Distribution Cabinet, strict adherence to the following protocols is mandatory. Before commissioning the unit after initial installation or any maintenance/repair activity, the following technical inspections must be performed.

Pre-Operational Inspection Checklist

  • Schematic Compliance: Verify that all electrical components, internal busbars, and wiring configurations strictly align with the approved engineering drawings and technical documentation.

  • Mechanical Integrity: Manually cycle the knife switches and circuit breakers to ensure smooth mechanical operation. There should be no signs of jamming, excessive friction, or misalignment.

  • Connection Reliability: Conduct a torque check on all electrical terminals. Ensure all connections are secure, meet the equipment’s conductivity requirements, and are free from loose strands.

  • Sanitization and Fastening: Inspect the cabinet interior for foreign debris (such as wire clippings, dust, or tools). Confirm that all mounting hardware and fixing screws are tightened to the specified tension.

Ordering Guidelines & Technical Requirements

To provide a solution precisely tailored to your industrial requirements, please include the following technical documentation when placing an order for the XL-21 series:

1. Primary Circuit Configuration

  • Provide a comprehensive Single-Line Diagram (SLD).

  • Clearly indicate the incoming and outgoing feeder capacities and busbar ratings.

2. Secondary Circuit Design

  • Provide an Expanded Secondary Circuit Diagram.

  • Include details for metering, relay protection, and control logic (Auto/Manual/Remote).

3. Component Specifications

  • Submit a detailed Bill of Materials (BOM) including specific parameters (Amperage, Breaking Capacity $I_{cu}$, and Voltage $U_e$).

  • Specify preferred brands or technical grades for circuit breakers, transformers, and monitoring instruments.

 

 

 

Select at least 2 products
to compare